Machine fittings with brass material

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-07-10 06:06

  • Browse the number:

    39

Send an inquiries
+
Longkou Shengxuan lnternational Trade Co. Ltd
Contactaixin:

Contactaixin:

lkshengxuan(Mr.)  

telephone:

Area:

Beijing

Address:

East Shops of Longzujunjing, Longgang Road, South of Heping Road,Longkoushi, Yantai, Shandong, China (265700)

Website:

http://lkshengxuan.hvac-top.com/

+
Model Number: DX-103-#4564 Brand Name: DEXIN Key Specifications/Special Features: Ensure quality by good faith pay back the society by reputationAdvantages:Environmental: no pollution, free of harm to body, be reused for many times.High efficiency: easy to install, just to insert for OK, much easier to remove.Safety: no leakage of water, durable and reliable, beauty and elegance.High temperature resistance: be used for long time in the temperature of 125 ℃.304 hygienic stainless steel, rustless, no oxidization, be used with the building.The machine fittings of sixth generation of plug type is refined processing by the material of brass 58-3, the pipe adopt the 304 hygienic stainless steel, and the service life is the same with the building.
The machine fittings use the EPDM material to seal, double sealed/plug type/spiral of the engineering design.

Install/ remove and refit
  1. Use the pipe cutter to cut the pipe according to the size; deburring by the tools if there is some burrs.
  2. Plug the pipe into the pipe fitting, and deeply screw down to fit it.
  3. Unsrew the nut and pull out the pipe, then plug the pipe into the pipe fitting according to the remeasured-size when refitting and removal; if it needs to change for the project after a certain time, hook up the EPDM seal ring and change the accessories.
Shipping Information:
  • FOB Port: Qingdao
  • Lead Time: 30 - 60 days
Main Export Markets:
  • Asia
  • Australasia
  • Western Europe