Ceiling Mounted Evaporative Cooler
Delivery term:The date of payment from buyers deliver within days-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Jiangsu
-
Validity to:
Long-term effective
-
Last update:
2024-04-05 23:35
-
Browse the number:
314
+
- Contactaixin:
Contactaixin:
yxjiangnan(Mr.)
- Email: telephone: phone:
-
Area:
Jiangsu
Address:6 Nancao West Road, Yixing City, Wuxi City, Jiangsu Province
-
Website:
http://www.slairconditioning.com/ http://yxjiangnan.hvac-top.com/
+
Â
Introduction:
Â
Fan chiller is divided into one, two, three, four fans.Fin using imported fin production line. Advanced sheet design, the overall corrugated fin can maintain high heat exchange efficiency even during the frost formation process.
Â
Guarantee for safety in operation:
Â
Operating pressure of stainless steel pipeline is up to 5.0Mpa, blasting pressure up to 50Mpa.
Â
3.0Mpa pressure test ,pressure holding time24 hours.
Â
Stainless steel eddy current inspection to ensure the reliability of raw material pipeline.
Â
Â
FAQ
Â
Q: Where are we?
Q: What can you buy from us?
Q: How can we guarantee quality?
Always final Inspection before shipment.
Â
http://www.slairconditioning.com/